What Size Wire for 125 Amp 250 Feet Away

Table-based wire size estimate for 125 amps at 250 feet on a 240V single-phase circuit. Immediate answer below.

Updated November 12, 2026

Recommended Wire Size

Copper
2/0 AWG
Voltage drop: 2.95% (7.090V)
Voltage at load: 232.91V
Ampacity used: 175 A (75°C column). Controlling factor: Voltage Drop (3% limit)
Aluminum
4/0 AWG
Voltage drop: 2.91% (6.992V)
Voltage at load: 233.01V
Ampacity used: 180 A (75°C column). Controlling factor: Voltage Drop (3% limit)

Required ampacity: 125 A × 1 = 125 A. Drop uses 125 A. Ampacity: NEC Table 310.16, 75°C column (NEC 110.14(C) for circuits above 100 A), single-phase, 240V, 3% max voltage drop, one-way distance 250 ft.

Voltage drop uses AC resistance and reactance from NEC Chapter 9 Table 9 (NEC 2017 Table 9 values) for conductors in steel conduit at 0.85 lagging power factor, effective Z = R × PF + XL × sin(acos PF), single-phase, one set, VD = 2 × I × Z × L / 1000. Ampacity uses NEC 2023 Table 310.16 at 30°C ambient with no more than three current-carrying conductors. These are the same engine and defaults as the wire size calculator (steel conduit, PF 0.85).

Wire Comparison Table

Wire SizeAmpacityV-Drop (V)V-Drop (%)V at LoadStatus
1 AWG130A10.377V4.32%229.62V
1/0 AWG150A8.186V3.41%231.81V
2/0 AWGREC175A7.09V2.95%232.91V
3/0 AWG200A5.909V2.46%234.09V
4/0 AWG230A5.026V2.09%234.97V

Table shows nearby candidate sizes for 125A at 250 ft on 240V (copper). Green check = meets both ampacity and 3% voltage drop (Table 9, steel conduit, PF 0.85). REC = smallest size meeting these two model checks. See the full conductor tables for other sizes.

Distributed loads after a remote panel

A remote panel serving several outgoing circuits should be checked at the likely simultaneous operating condition. A branch motor start and the feeder’s steady current are different cases, not numbers to substitute indiscriminately. Record feeder loss and branch loss separately so a later load addition can be traced through the complete supply path.

Why this copper conductor?

2/0 AWG has a site ampacity of 175 A against a required 125 A. Table 9 lists R = 0.1 and XL = 0.054 Ω/kft (steel conduit), so at PF 0.85 its effective Z is 0.1134 Ω/kft. Substituting the actual load into 2 × 125 × 250 × 0.1134 / 1000 gives 7.090 V (2.95%).

The next smaller size, 1/0 AWG, has 150 A of site ampacity and 3.41% drop on this route. It fails the voltage-drop target.

3% route-length limit: 253.9 ft one way; remaining margin: 3.9 ft. This margin excludes upstream loss and does not authorize extra load.

Which assumption changes this selection?

copper: 125 A · 250 ft · 240 V. Alternatives are hypothetical; all results use the same Table 9 model (Table 9, steel conduit, PF 0.85).

AssumptionLoad / route / supplyRequired ampacityMinimum sizeDrop / end voltage
Present route, 3% target125 A / 250 ft / 240 V125 A2/0 AWG7.090 V (2.95%) / 232.910 V
Reserve more voltage: 2% target125 A / 250 ft / 240 V125 A250 kcmil4.581 V (1.91%) / 235.419 V
Sub-panel feeder: Feeder allocated 1% of supply voltage125 A / 250 ft / 240 V125 ANo single conductor in the table meets both ampacity and voltage-drop limits for this input. Use parallel sets or a larger conductor, and have the design reviewed.No supported single conductor

The 1% allocation leaves 4 percentage points of a hypothetical 5% whole-path target for downstream wiring. The 2% allocation leaves 3 points, and 3% leaves 2. These are budgets referenced to the same supply voltage; add actual drops at the same load before comparing the final outlet voltage.

3% → 2% changes 2/0 AWG → 250 kcmil. Load-voltage gain: 2.510 V. Original conductor’s 2% length limit: 169.2 ft one way.

Key Considerations

Use the calculated feeder demand, separating continuous and noncontinuous loads. The panel bus rating is a maximum equipment rating, not proof that the panel draws that current; no diversity or continuous-load factor is applied here.

A feeder drop uses part of the budget available at the final outlet. Add the downstream branch drop at the same operating condition rather than treating a feeder target and a branch target as independent full allowances.

For a typical downstream panel, keep the neutral isolated from the enclosure and equipment grounding bar. A detached structure also needs a grounding review; earth is not a substitute for the equipment grounding conductor.

This balanced line-to-line estimate does not size the neutral or predict unbalanced line-to-neutral voltage. List the actual loads on each leg and verify neutral current, protection and terminal ratings separately.

Reference: NFPA 70 (NEC), including Articles 215, 240, 310, 430, 440, 547, 625 and 680 as applicable. Verify the adopted edition and equipment instructions. These are calculated examples, not installation approvals.

Frequently Asked Questions

What size wire do I need for a 125 amp feeder at 250 feet?▾
For a 125A/240V circuit at 250 feet, use 2/0 AWG copper (2.95% drop) or 4/0 AWG aluminum. The ampacity check uses 125A; voltage drop uses the actual 125A (NEC Chapter 9 Table 9 impedance, Table 9, steel conduit, PF 0.85). Installation adjustments and equipment ratings must be checked separately.
Can I use aluminum wire for a 125 amp circuit?▾
At 125A over 250 ft, use 4/0 AWG aluminum (2.91% voltage drop). Use only equipment and connectors listed for this aluminum gauge; follow their preparation instructions.
What happens if the voltage drop exceeds 3%?▾
3% is a planning target, not installation approval. Here it means 232.8V at the load before upstream loss. Compare the combined path with the equipment’s operating range.